What Will Be The JP Power Share Price Target 2025

Incorporated in 1994, Jaiprakash Power Ventures Limited (JPVL) has established itself as a prominent player in the energy sector. Let’s predict based on technical analysis what will be the JP Power share price target 2025.

The company operates in various segments including coal mining, sand mining, cement grinding, and the production of thermal and hydroelectric power.

JP Power Share Price Target for 2025

Given the company’s diversified operations, strategic debt restructuring, and recent financial performance, we can forecast potential share price targets for JPVL in 2025:

MonthProjected Share Price (₹)
Jan 202522.00
Feb 202522.50
Mar 202523.00
Apr 202523.50
May 202524.00
Jun 202524.50
Jul 202525.00
Aug 202525.50
Sep 202526.00
Oct 202526.50
Nov 202527.00
Dec 202527.50

Overview of Power Plant Operations

JPVL operates three major power plants with a total capacity of 2,220 MW. Each plant plays a crucial role in the company’s energy production capabilities:

Vishnuprayag Hydro-Electric Plant

Located in Uttarakhand, this 400 MW plant has been operational since October 2006. It leverages hydroelectric power to contribute significantly to JPVL’s overall energy output.

Jaypee Bina Thermal Power Plant

Situated in Sagar, Madhya Pradesh, this plant has a capacity of 500 MW, split across two 250 MW units. The first unit commenced operations in August 2012, followed by the second in April 2013.

Jaypee Nigrie Supercritical Thermal Power Plant

Located in Singrauli, Madhya Pradesh, this plant boasts a capacity of 1,320 MW, with two 660 MW units. The first unit began operations in September 2014, and the second in February 2015.

Cement Grinding and Coal Mining Operations

JPVL’s operations extend beyond power generation to include cement grinding and coal mining:

Cement Grinding

The Jaypee Nigrie Cement Grinding plant has a capacity of 2.0 MTPA. However, it ceased production in FY22 as part of a debt reduction plan.

A non-binding agreement for its divestment was signed in December 2022, valuing the plant at Rs. 250 crores.

Captive Coal Mine

JPVL operates the Amelia (North) coal mine in Madhya Pradesh. The mine, secured through reverse bidding, has an annual drawing capacity of 2.8 MTPA, catering to the fuel needs of the Nigrie Thermal Power Plant. Any additional fuel requirements are met through e-auctions.

Power Purchase Agreement

JPVL has a Power Purchase Agreement (PPA) with the Madhya Pradesh Power Management Company Ltd (MPPMCL).

Under this agreement, JPVL supplies 65% of its installed capacity at a tariff set by the Madhya Pradesh Electricity Regulatory Commission (MPERC).

An additional 5% of the actual generation is supplied at a variable cost, resulting in 70% of the plant’s capacity being sold to MPPMCL. The remaining capacity is sold as merchant power.

Foreign Currency Convertible Bonds (FCCB)

In FY10, JPVL issued FCCBs worth USD 200 million. In 2019, with lender consent, these bonds were mandatorily converted into equity shares at Rs. 12 per share. This move waived off all outstanding interest due, improving the company’s financial health.

Recent Financial Performance

JPVL’s financial performance has seen significant fluctuations over the past few years. Below is a summary of their quarterly results:

PeriodMar-21Jun-21Sep-21Dec-21Mar-22Jun-22Sep-22Dec-22Mar-23Jun-23Sep-23Dec-23Mar-24
Sales9579159021,4011,4061,8201,3851,2011,3801,7081,3502,1901,515
Expenses6826596841,0371,1321,1921,1301,1911,1531,1869391,613788
Operating Profit27525621836527562825610227521411577727
OPM %29%28%24%26%20%35%18%1%16%31%30%26%48%
Other Income23611475112691165-17-70-5646
Interest140141137136143150138135137119117105109
Depreciation119120121121119116117117115115116117116
Profit before tax25176158139372117-238-26294108299548
Tax %14%39%124%33%102%35%36%8%-69%35%36%42%-7%
Net Profit2154-1107-224275-218-4419269173589
EPS in Rs0.310.01-0.000.16-0.000.350.11-0.32-0.060.280.100.250.86

Revenue Breakdown – FY23

  • Revenue from Operations: 98%
  • Other Income: 2%

Segment Revenue – FY23

  • Power: 77%
  • Coal: 9%
  • Sand Mining: 14%

Debt Restructuring

In April 2019, JPVL underwent significant debt restructuring, reducing its total debt from Rs 11,149 crore in March 2019 to Rs 5,164 crore by September 2021.

This was achieved through asset sales and strategic debt repayments, significantly improving the company’s financial stability.

Conclusion

Jaiprakash Power Ventures Limited has demonstrated resilience and strategic growth through its diversified operations and robust financial restructuring.

With continued focus on debt reduction, operational efficiency, and market expansion, JPVL is poised for significant growth.

Investors should closely monitor the company’s progress and market conditions to make informed decisions regarding JPVL’s share price potential in 2025.